Change order of collectibles?

samsquared

飛べ
Joined
Jul 8, 2014
Posts
1,763
Bells
31
Eggs
0
Switch
0358-4407-0607
Jingle Christmas Doll
Holiday Candy Cane 2020
Green Christmas Stocking
Tin Robot
Christmas Candy
Yellow Star Fragment
Pink Star Fragment
White Star Fragment
Red Star Fragment
Orange Mote of Flame
Is there a way for me to change the order in which my collectibles appear?
Like can I line up my birthstones, etc?
Thanks for your consideration~!
 
It's not possible. Collectibles are organized based on how old they are (aka how long they have been since they were purchased from the shop).
 
Back
Top